ISLAMABAD: In an attempt to reduce the prevailing energy crisis in the country, Prime Minister Yousuf Raza Gilani on Tuesday laid the foundation stone of the Diamer Bhasha Dam in Gilgit-Baltistan.
The dam is being built about 40 kilometres from Chilas on the Indus River and will have a capacity of producing 4,500 megawatts of electricity.
The construction of the dam will cost around $11.17 billion and can store around 8.1 million acre-foot of water. The dam will provide more than 6.4 million acre-foot of water to irrigate a large area of agricultural land.
After the foundation stone laying ceremony, the prime minister addressed a public gathering and said that the dam construction would open many jobs and contribute to the economic uplift of Gilgit-Baltistan.